OVERVIEW

P Quinn Construction Limited supported the lead contractor with maintenance works in a large forestry location in Warwickshire.

Alongside labour, we provided a 16T Doosan excavator with Engcon tilt rotator and forestry attachments to handle the heavy lifting of the tallest trees. We also supplied two smaller excavators: an 8T Mecalac excavator with TMK tree shear and Botex grab, and Kubota with grab, to get into the areas in the forest where a larger excavator would not be able to fit.

In addition to clearing 14 miles of hedgerow and trees, we removed old barbed wire fencing using the 16T Doosan excavator as part of the on site maintenance.

PROJECT DETAILS

  • 14 miles of tree and hedge clearance
  • 1 mile of old fencing removed
  • 3 excavators with attachments supplied

PROJECT DETAILS

Categories:
Client: Ventureserve
Location: Warwickshire
Completed: 2021